Designing of cost-efficient coal
preparation plants

 

Designing of open-pit
mining

 

Designing of underground
mining

 

Designing of industrial
facilities

 

Local designing

 
 
  • Utility
    systems
  • General layout
    plan
  • Process
    solutions
  • Structural
    design
  • Architectural
    solutions
  • Additional
    investment
    projects
  • Demolition and
    dismantling
  • Environment
    protection
  • Special
    sections
  • Linear
    facilities

Institute Leadership

«With more than 20 year experience in coal preparation industry, we can see what our Customer needs
and implement in our projects brand new and high efficient technologies and practices»

Valeriy Balachnin

Директор по открытым горным работам ООО «ПГПИ»

 

Mr Balachnin is engaged in development and implementation of projects on the increase in capacity and efficiency of open pit coal mining.

 

From 2006 to 2013 he held the position from a principal engineer to a production manager of an open pit mine OAO Razrez Kiselyovskiy;
From 2013 to 2015 he was a chief engineer of the project OOO Prokopgiprougol.

 

In 2000 Mr Balachnin graduated with honour from Kuzbass State Technical University with a degree in Mining.
In 2009 he took courses of Hydroprombezopasnost REC “Training program for managers and specialists of organizations that are under the control of Russian Federal Service for Ecological, Technical and Atomic Supervision (Rostekhnadzor) for being able to operate hydraulic structures”.
2015 – Association of organizations in the sphere of subsurface management “National Association for Subsoil Examination” “Experience and innovations during the preparation and provision of a feasibility study, reserve estimation report and detailed development plan of solid minerals deposits to National Reserves Committee of the Federal Subsoil Management Agency and Central Committee for solid mineral deposits development of Rosnedra conditions”.
2016 – OERN “Modern and potential requirements to the organization of subsurface use, geological study of subsurface resources and estimation of coal deposits resources”.

 

Dmitry Bendin

Director of Beneficiation

 

From 2011 to 2015 – Chief Engineer of Coal preparation plants Kuznetskaya, Abashevskaya, Shchedrukhinskaya, Koksovaya.

 

Experience in management of 400 people team.

 

Graduated with honours from Moscow Open State University with a degree in Mineral Processing in 2001.

 

Olga Veretennikova

Commercial director

 

Implementation of turn-key projects: from the analysis of technical and economic expediency of the particular object to the front end engineering design, obtaining of all the necessary permits and approvals, site selection, construction and commissioning.

 

She is a graduate of Siberian State Industrial University with a degree in Industrial and Civil Construction.

 

Ms Veretennikova has undergone training "Art of negotiations" in the Center of Personnel Technologies “Workforce capacity” LLC, Moscow city.

 

"Effective argumentation". Training company LiCO, Saint-Petersburg city.

 

"Efficient management". Training Institute ARB PRO, Saint-Petersburg city.

 

Dmitry Yeryomenko

Chief Executive Officer

 

Mr Yeryomenko is engaged in developing and carrying out projects on the increase in capacity and efficiency of existing coal preparation plants.

He has his own pre-design works and layout solutions which have been of great assistance during designing of new coal preparation plants and upgrading of the existing ones.

Mr Yeryomenko held the position of the director of the coal preparation plants Pechorskaya, Shchedrukhinskaya, Koksovaya, Krasnogorskaya.

He is a graduate of Moscow State University with a degree in Mineral Processing.

Mr Yeryomenko has done training in DUPONT Russia LLC “Safety management: effective systems applied by production managers”.

Centre of Administrative management “Basic system of corporate governance”.

Siberian State University with a degree in “Economics in mining enterprises”.

Valeriy Balachnin

Директор по открытым горным работам ООО «ПГПИ»

 

Mr Balachnin is engaged in development and implementation of projects on the increase in capacity and efficiency of open pit coal mining.

 

From 2006 to 2013 he held the position from a principal engineer to a production manager of an open pit mine OAO Razrez Kiselyovskiy;
From 2013 to 2015 he was a chief engineer of the project OOO Prokopgiprougol.

 

In 2000 Mr Balachnin graduated with honour from Kuzbass State Technical University with a degree in Mining.
In 2009 he took courses of Hydroprombezopasnost REC “Training program for managers and specialists of organizations that are under the control of Russian Federal Service for Ecological, Technical and Atomic Supervision (Rostekhnadzor) for being able to operate hydraulic structures”.
2015 – Association of organizations in the sphere of subsurface management “National Association for Subsoil Examination” “Experience and innovations during the preparation and provision of a feasibility study, reserve estimation report and detailed development plan of solid minerals deposits to National Reserves Committee of the Federal Subsoil Management Agency and Central Committee for solid mineral deposits development of Rosnedra conditions”.
2016 – OERN “Modern and potential requirements to the organization of subsurface use, geological study of subsurface resources and estimation of coal deposits resources”.

 


Dmitry Bendin

Director of Beneficiation

 

From 2011 to 2015 – Chief Engineer of Coal preparation plants Kuznetskaya, Abashevskaya, Shchedrukhinskaya, Koksovaya.

 

Experience in management of 400 people team.

 

Graduated with honours from Moscow Open State University with a degree in Mineral Processing in 2001.

 


Olga Veretennikova

Commercial director

 

Implementation of turn-key projects: from the analysis of technical and economic expediency of the particular object to the front end engineering design, obtaining of all the necessary permits and approvals, site selection, construction and commissioning.

 

She is a graduate of Siberian State Industrial University with a degree in Industrial and Civil Construction.

 

Ms Veretennikova has undergone training "Art of negotiations" in the Center of Personnel Technologies “Workforce capacity” LLC, Moscow city.

 

"Effective argumentation". Training company LiCO, Saint-Petersburg city.

 

"Efficient management". Training Institute ARB PRO, Saint-Petersburg city.

 


Dmitry Yeryomenko

Chief Executive Officer

 

Mr Yeryomenko is engaged in developing and carrying out projects on the increase in capacity and efficiency of existing coal preparation plants.

He has his own pre-design works and layout solutions which have been of great assistance during designing of new coal preparation plants and upgrading of the existing ones.

Mr Yeryomenko held the position of the director of the coal preparation plants Pechorskaya, Shchedrukhinskaya, Koksovaya, Krasnogorskaya.

He is a graduate of Moscow State University with a degree in Mineral Processing.

Mr Yeryomenko has done training in DUPONT Russia LLC “Safety management: effective systems applied by production managers”.

Centre of Administrative management “Basic system of corporate governance”.

Siberian State University with a degree in “Economics in mining enterprises”.

Certificates and licenses

We have all necessary certificates and licenses in accordance with the applicable legislation
of Russian Federation which are necessary for executing business.

LICENSE № PM-68-002172 “Execution of mine-surveying work” dated 8 October 2013

CERTIFICATE of clearance to the particular kind or kinds of work that have an impact on the safety of capital construction objects № PNTS 120160/164

GOST Russia Certificate of Conformity ISO 9001-2015 (ISO 9001:2015) № ST.RU.0001.M0009453 dated 26.08.2016.
Quality management system which is applicable to the construction works, refurbishment and overhaul of capital construction objects, to front end engineering design of capital construction objects that have an impact on the safety of capital construction objects.

News


The process of dumping on the surface mining is one of the most problematic in terms of industrial safety. The problem is compounded by the fact that the external dumps are often pilled on unprepared base, composed of clay.

The main direction of Prokopyevsk Mining and Design Institute has been comprehensive design in the area of subsoil use and coal conversion.

Каждая задача индивидуальна. Давайте обсудим именно Вашу.

данная информация не будет использована для спама или передана третьим лицам

 

Content block 'block/form1' not found
Информация о партнере